Method statement of vinyl sheet

LONLEUM INSTALLATION SPECIFICATIONS

1. LONLEUM

LONSEUM is a resilient flooring especially formulated of PVC resins (PolyVinyl Chloride) and has the following structure and specifications.

1 - 1. STRUCTURE

                 (Fig - 1)

________________________
________________________  
........................................................
........................................................
........................................................

)
}
-------
-------
Wear Layer
Medium Layer
Backing
Overall Thinkness

0.4 mm

1.6 mm

2.0 mm

0.4 mm

2.1 mm

2.5 mm

 

 

 

 

Weaw Layer:This Layer is blended much of PVC resin so that it may with may withstands abrasion and water as well as chemicals.
Medium Layer:

This Layer is blended relatively much of inoraganic filler, so as to provide a good dimensional stability. 

Backing:Backing cloth ensures extra-good installation adhesion and further improves dimensional. 

 